More than 16 years providing operation and maintenance services to this power plant.

Other services provided have been:
  • Modernization and automation of the control system, in partnership with France’s ENCOSyst Company.
  • Disassembly of old control equipment.
  • Supply, assembly and connection of control equipment (panels, cabinets, SCADA system, historian).
  • Programming and configuration of the equipment provided.
  • Commissioning of the new equipment and SCADA.
  • Training for power plant staff.
  • Installation of control cable, power cable and signal integration into the SCADA system of the new Unit 1 Power Transformer.
Sarapiquí, Costa Rica
2 x 9.000 kW
Turbina Horizontal Francis
16 years and up until the present